XY-2PC core exploration drilling rig
Product Description
The efficient operation of XY-2PC drilling rig requires a combination of equipment characteristics (lightweight, multi speed, hydraulic feed) and geological conditions, through reasonable parameter adjustment, standardized maintenance and emergency response capabilities, to ensure construction quality and safety. In practical operations, it is recommended to develop a drilling plan in advance based on the on-site geological survey report, and keep good log records to gradually accumulate targeted experience.
Product Tech Data
Drill rig specification |
Drilling depth | 300m |
Drilling Diameter(Multiple diameters) | 91mm,110mm,130mm,150mm,300mm |
Drilling rod diameter | 50mm |
Drilling Angle | 0°-90° |
Dimensions(L×W×H) | 1720×800×1300 (mm) |
Weight | 650kg |
Swivel Head |
Spindle Speed | 164, 298, 334, 587, 1190 r/min(Multi speed) |
Spindle stroke | 500mm |
Spindle Dia. | Φ59mmx53mmx5500mm Kelly rod |
Spindle lifting capacity max | 25KN |
Hoist |
Max. Lifting capacity(single rope) | 20KN.m |
Lifting rotating speed | 20; 40; 90; 168r/min |
Wire rope diameter | 14 |
Wire rope capability | 30KN |
What are the maintenance methods for XY-2PC drilling rig
The maintenance of XY-2PC drilling rig should follow the principle of "prevention first, mandatory maintenance", focusing on lubrication, sealing, cleaning, and fastener status, especially paying attention to the oil management of the transmission system and hydraulic system. Through standardized maintenance, the accident rate inside the hole can be effectively reduced, the service life of the drilling rig can be extended (the whole machine life can reach 8-10 years under normal maintenance), while ensuring operational efficiency and personnel safety. In practical operation, it is recommended to develop a personalized maintenance checklist based on the equipment manual and on-site conditions, and have professional personnel perform the dismantling and inspection of complex components.
Safety precautions
When maintaining the chain, it is necessary to ensure that the drilling rig is in a stopped state, cut off the power source, and hang a "Do Not Start" warning sign at the operating handle to prevent safety accidents caused by misoperation.
When adjusting the tension of the chain or performing other maintenance operations, be careful to prevent fingers or other body parts from being pinched by the chain or related components.
When using cleaning agents and lubricants, pay attention to fire and explosion prevention, and avoid operating near open flames or high temperature sources. Meanwhile, it is necessary to properly handle used cleaning agents and lubricants to prevent environmental pollution.
For unfamiliar maintenance operations or complex faults, do not handle them without authorization. Instead, promptly contact professional maintenance personnel for repairs to ensure the quality and safety of maintenance and repair work.