Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Water Well Drilling Rig Machine /

18HP Water Well Drilling Rig Machine 22KW For Deep Borehole Engineering GK 200

Contact Now
Jinzhou City Shitan Machinery Equipment CO. LTD.
Visit Website
City:jinzhou
Province/State:hebei
Country/Region:china
Contact Person:MissAnna
Contact Now

18HP Water Well Drilling Rig Machine 22KW For Deep Borehole Engineering GK 200

Ask Latest Price
Video Channel
Brand Name :ShiTan
Model Number :GK 200
Certification :ISO
Place of Origin :China
MOQ :1 SET
Price :Customzied Quotation list
Payment Terms :T/T, Western Union
Supply Ability :2000SETS/YEAR
Delivery Time :7 DAYS AFTER PREPAID
Packaging Details :Plastic film and Standard export wooden box
Product Name :GK 200 Water Well Drilling Rig Machine
Drilling Depth :200 meters
Drilling Hole Diameter :295mm
Guarantee time :12 months
Color :Yellow,Red and Blue
Application :Water Well Drilling ,Exploration ,Coring
Place of origin :Hebei,China
Power :Diesel Engine
After sale service :Video Support
OEM :Acceptable
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

18 HP GK 200 Portable Water Well Drilling Rig Machine For Deep Borehole Engineering

Product Description

200m Water Well Drilling Rig 6-9M/ Hour Easy Operation Standard Water well drilling rig is also called bore hole drilling rig Gk-200-2 drilling machine is widely used and hydraulic feeding , which has the characteristics of large power, large lifting force (2T) and high transmission torque.

Product Technical Parameter

Drilling depth 200m
Max open hole caliber 300mm
End hole caliber 75mm
Drill rod caliber 60mm
Drilling angle 90°~75°
Drill weight (without power) 975kg
Triangle convert belt B950 x 4 B1700 x 3
The main machine moving distance 300mm
Power Diesel engine 22KW /Electric motor 15kw
Spindle
spindle speed 64, 128, 287, 557r/min
Spindle stroke 450mm
Hoist
Max.lifting capacity 2400kg
Single line lifting speed 0.41, 0.82, 1.64m/s
Wire rope caliber 13mm
Wire rope length 35m
Reel diameter 140mm
Hug floodgate caliber 260mm
Hug floodgate belt width 70mm
Mud pump
Type Horizontal single-urn twin-action
Displacement Diesel engine 170L/min Electric motor 150L/min
Maximum pressure 3Mpa
Work pressure 1.5Mpa
Inlet pipe caliber 40mm
Outlet pipe caliber 30mm
Triangle convert belt B1728mm
Hydraulic oil pump
Type CBT-F-314
Triangle convert belt B1100 X 1

Product Advantages

Adopt automatic hydraulic feeding equipment,improve the drilling efficient;Can replace the drilling rod without stop;Centralized handles, easy operation, safe and reliable.;The drilling rig, pump and diesel engine are installed on a common base frame to make sure the compact structure and save space;The weight is light with high detachability ,easy transportation suit for the operate in plains and mountain areas

What aspects should we pay attention to in the drilling process of water well drilling rig?

Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.

18HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 200

18HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 20018HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 20018HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 20018HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 200

Inquiry Cart 0