
Add to Cart
400 Meters Depth Commerical Business Pneumatic Borewell Machine For Water Well
ST 400 Pneumatic Borewell Machine Information
With 400 meters depth ,suitable for geothermal air conditioning holes and other wells, especially suitable for water intake projects in mountainous areas and rock formations,this rig can both work with mud pump and air compressor .This drilling rig needs to be used with an air compressor. If you want to buy an air compressor at the same time, please tell us your drilling depth and diameter, and we will give the corresponding recommendation
ST 400 Pneumatic Borewell Machine Technical Data
Product Name | ST 400 Drilling Rig |
Max drilling depth | 400 Meters |
Drilling diameter | 105-325 mm |
Air pressure | 1.2-3.5mpa |
Rod length | 3 meter |
Rod diameter | 89-102-114mm |
Main shaft pressure | 5T |
Lifting force | 25T |
Power head stroke | 6.6M |
Max rotary torque | 12000Nm |
Max rotary speed | 100r/ rmin |
Secondary winch liftng force | 3T |
Jacks stroke | 1.5m |
Moving speed | 2.5km/h |
Uphill angle | 21°Slope |
Weight of the rig | 8.8T |
The engine | 92KW / 6 cylinder |
Overall dimensions | 3900*1600*2350mm |
Working condition | Loose layer and bedrock |
Drilling method | Hydraulic rotary, down-the-hole impactor |
1. The drilling rig hydraulic transmission of the rig effectively utilizes the power. This makes the overall power loss small and the drilling cost low.
What is the construction technology of de watering well?
Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.
Precautions for drilling machine working at low temperature
1. In the low temperature environment, the land will become hard, so when we choose the site, we need to have some requirements. The site needs to be flat and the road needs to be unblocked. This must be ensured.
2. The drilling machine mainly uses triangular support, especially in the case of low temperature, we should ensure that the support of the drilling machine is firm and reliable. Our staff need to regularly check and deal with hidden dangers in time once they are found. We must not be careless
3. Although we work at low temperature, we can not ignore the problem of fire prevention. The configuration of fire-fighting equipment must be reasonable and meet the fire-fighting requirements.
4. Low temperature, low temperature, what is the most important? Of course, our friends should pay attention to their warmth when working. Only when they are warm can we better put ourselves into work.
5. The temperature is low, which will definitely have certain impact on the construction. We must pay attention to warmth and safety