Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Hydraulic Borewell Machine /

Personal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters Depth

Contact Now
Jinzhou City Shitan Machinery Equipment CO. LTD.
Visit Website
City:jinzhou
Province/State:hebei
Country/Region:china
Contact Person:MissAnna
Contact Now

Personal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters Depth

Ask Latest Price
Video Channel
Brand Name :JINZHOU SHITAN
Model Number :ST-50
Certification :ISO9001
Place of Origin :China
MOQ :1 set
Price :Negotiation
Payment Terms :T/T, Western Union
Supply Ability :5000 sets per year
Delivery Time :3 days
Packaging Details :Standard Export Package
Product Name :Hydraulic Borewell Machine
Drilling Depth :50 Meters
Condition :New
Type :Core Drilling Rig
Power Type :Electric
Usage :Coal
Voltage :380V
Warranty :1 Year
Material :Steel
OEM :Acceptable
Color :Optional Red,Yellow
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Personal Portable 2 Wheels 50 Meters Depth Hydraulic Borewell Machine

ST 50 Hydraulic Borehole Drilling Machine :

ST 50 is a light weight, simple structure, fast drilling speed and large diameter of coring samples.It has a 50 meters drilling depth and 75mm hole diameter, a small sampling drilling equipment suitable for plains, mountainous areas and areas with inconvenient transportation and energy. It is now widely used in railway, water conservancy and other construction projects, as well as geological core drilling and small grouting holes in wild mountainous areas.

ST 50 Borehole Drilling Machine Technical Information:

Max drilling depth 50m
Max .opening diameter φ75-φ108mm
End hole diameter 56-75mm
Active drill pipe 50/1000mm
Drill pipe diameter Φ42mm
Drill pipe length 1000mm
Power (diesel engine) 5.8kw(8P)/2200r/min
Size 1400*600*1600mm
Weight 240kg
Spindle
Speed 285-570r/min
Torque 600 N*m
Stroke 1000mm
Lifting force 300KG
Pressure 200KG
Drilling Tower (optional)
Rated load 1t
Height 4m
Tower leg specifications 60mm
Mud Pump
Model BW-50
Flow 50L/min
Max.pressure 1.2Mpa
Times 63/min
Inlet hose diameter φ55mm*2.5m
Outlet hose diameter Φ20mm*10m

ST 50 Borehole Drilling Machine Features:

1. Equipped with double-cylinder hydraulic feeding system, fast drilling speed and high work efficiency. 2. The drilling rig is equipped with a fixed clamping mechanism and an integrated main rod, no drilling tower is required, and the work is convenient. 3. Equipped with 4-speed transmission system. The operator can freely adjust the forward rotation speed through three gears, and is also equipped with a slow reverse gear, which is convenient for the operator to disassemble the drill pipe and drilling tool. 4. The handle is centralized, easy to operate, safe and feasible. 5. Equipped with a pressure gauge at the bottom of the hole to indicate the pressure, which is convenient to grasp the situation in the hole. 6. Compact structure and small footprint. 7. Strong decomposition ability, easy to relocate, suitable for complex terrain work such as hills and mountainous areas.

What can we do for you --Shitan Machinery

Q 1: What kind of drilling rig do you have?

A: We mainly produce small hydraulic drilling rig, water well drilling rig, core drilling rig, engineering drilling rig, geological exploration drilling rig, etc., and we will recommend the suitable model according to your exact requirement .

Q 2: Where is the address of your company?

A: Our factory is in Jinzhou, Shijiazhuang City, Hebei Province, China

Q 3: Are you a manufacturer or a trading company?

A:We are a 20 years professional manufacturer with ISO certificate. We have a large modern drilling rig plant in Hebei, China.

Q 4: How long is your delivery time?

A: Small hydraulic drilling rigs generally take 5-7 days, and large pneumatic water well drilling rigs generally take 7-15 days. If there is an urgent order, please contact our sales in advance.

Q 5: How long is the warranty of your well drilling rig?

A: Except for consumable spare parts, the whole machine shall be one year.

How are the drill pipes in the well drill connected

The water well drilling rig can be used only after all parts are firmly installed and connected before being used for drilling.

The following are the relevant operation steps of adding and connecting the drill pipe of the water well drilling machine:

Operation of well drilling machine when adding drill pipe

1. When the depth of one drill pipe needs to be connected after drilling, stop the propulsion first, then stop the rotation, and turn off the cooling water;

2. Operate the clamping handle to make the gripper clamp the drill pipe and open the micro regulating flow valve (right rotation);

3. The rotator reverses, and at the same time, retracts the feed oil cylinder to rotate the water braid shaft away from the drill pipe;

4. Stop the rotation and operate the fast forward and backward handle to the fast backward position to make the chuck quickly return to place;

5. Connect the drill pipe to be added to the previous drill pipe, and the rotator moves forward while rotating. When the trapezoidal conical thread of the water braid shaft is in screw contact with the conical thread of the newly added drill pipe, immediately operate the gripper handle, loosen the gripper and complete the drill pipe addition.

Personal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters Depth

Personal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters DepthPersonal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters DepthPersonal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters DepthPersonal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters Depth
Personal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters Depth
Personal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters DepthPersonal Portable Hydraulic Borewell Machine 2 Wheels 50 Meters Depth

Inquiry Cart 0