Shitan Machinery XY-1 A Drilling Rig Equipment ,Customized Borehole Drilling Machine
XY-1 A Drilling Rig Equipment ,Customized Borehole Drilling Machine Description
XY-1A Hydraulic Drilling Rig Machine is a applicable for high-way and building construction foundation drilling ,general survey, geophysical exploration and blast hole drilling etc.
XY-1 A Drilling Rig Equipment ,Customized Borehole Drilling Machine Parameter
Drill rig Technical Data | Swivel Head |
Drilling depth | Max.150m | Spindle speed | 1010,790,470,295,140(r/min) |
Hole diameter | Max.150m | Spindle stroke | 450kmm |
Drill rod diameter | 42mm | Spindle pull-down | Max.15KN |
Angle range | 90-75 | Spindle lifting capacity | Max. 25KN |
Oil pump | Water pump |
Model | YBC-12/125 | Model | Horizontal reciprocating single-acting piston pump |
Rated pressure | 12.5Mpa | Working pressure | Max. 1.25Mpa |
Flow speed | 8ml/r | | |
Rated speed | 1500r/min | | |
Hoist | Power(diesel) |
Max. lifting capacity | 15KN | Model(diesel engine | ZS1105 |
Hoisting drum revolution | 121,76,36(r/min) | Rated power | 12.1KW |
Drum diameter | 140mm | Rated speed | 2200r/m |
WEIGHT | AROUND 600KG |
SIZE | 1620*970*1560mm |
XY-1 A Drilling Rig Equipment ,Customized Borehole Drilling Machine Applications
1. It has oil pressure automatic feeding mechanism and high drilling efficiency.
2. The ball clamp clamping mechanism is used to replace the chuck, which can reverse the rod without stopping, which is safe and reliable.
3. The handle is centralized, easy to operate and compact. The drilling rig, water pump and diesel engine are installed on the same covering a small area.
4. Light weight, strong decomposability, easy to move, suitable for plain and mountainous areas.
5. The vertical shaft has five speeds and the maximum speed can reach 1000 rpm. It is a high-speed drilling rig most commonly used in geological engineering exploration. It is suitable for sampling and exploration of various soft and hard formations.
Drilling Rigs Usage Points
1.The drill shall be placed stably and firmly, and the tappet shall be adjusted by automatic fine adjustment or plumb hammer
2.Before startup, check and confirm that all parts of the drilling rig are firmly connected, the tightness of the transmission belt is appropriate, the oil level in the reduction box meets the regulations, and the drilling depth limit alarm device is effective.
3.Before starting, the control lever shall be placed in the neutral position. After starting, the idle operation test shall be carried out to check that the instruments, temperature, sound, braking and other works normally before operation
4.During operation, when the rotation direction of the drilling rig needs to be changed, it shall be carried out after the drilling rig stops completely.



