High Drilling Speed Shitan ST 400 Customized Blue Color Pneumatic Borewell Machine
ST 400 Pneumatic Borewell Machine Product Information
It is mainly suitable for drilling water wells,agricultural irrigation wells, geothermal air conditioning holes and other wells, especially suitable for water intake projects in mountainous areas and rock formations. . The efficiency is ten times higher than that of traditional rotary drilling rigs, and the economic benefits created for users are extremely considerable.
ST 400 Pneumatic Borewell Machine Main Technical Data:
Model | Shitan ST 400 |
Max drilling depth | M | 400 |
Drilling diameter | mm | 105-325 |
Air pressure | Mpa | 1.2-3.5 |
Rod length | m | 3 |
Rod diameter | mm | 89-102-114 |
Main shaft pressure | T | 5 |
Lifting force | T | 25 |
Power head stroke | M | 6.6 |
Max rotary torque | Nm | 12000 |
Max rotary speed | r/min | 100 |
Secondary winch liftng force | T | 3 |
Jacks stroke | m | 1.5 |
Moving speed | km/h | 2.5 |
Uphill angle | Slope | 21° |
Weight of the rig | T | 8.8 |
The engine | 92KW / 6 cylinder |
Overall dimensions | 3900*1600*2350mm |
Working condition | Loose layer and bedrock |
Drilling method | Hydraulic rotary, down-the-hole impactor |
ST 400 Pneumatic Borewell Machine Main Advantages"
1. It improves drilling efficiency and reduces labor intensity With hydraulic automatic feeding mechanism.
2. It can be achievedwithout stopping to change rods, easy to operate, safe and reliable with ball clip holding mechanism orhydraulic chuck.
3. It hashole bottom pressure gauge to be easy to master the situation in the hole.
4. It also has advantage of Compact structure,concentrated handle, small footprint, light weight, strong decomposition, easy tomove. It can be operated in plains and mountainareas.
Pneumatic Borewell Machine maintenance
Our machines can be applied to various countries in the world, suitable for various scenarios, various geological scenarios including deserts, swamps, grasslands, mountains, orchards, etc.
Correct maintenance and repair is very important to maintain the technical performance, service life and reliability of the drilling rig. Daily maintenance and repair are carried out before and after the shift every day. The main contents are as follows:
(1) check whether all fasteners are loose.
(2) check whether the spindle rotates flexibly.
(3) check whether all control switches are normal and flexible.
(4) check whether the oiler is normal, whether the oil quantity is qualified and whether the oil quality is qualified.
(5) after use, it shall be cleaned in time to remove dirt and clean up.
(6) remove rust spots on rusty parts and apply rust inhibitor.
(7) there is a filter screen at the pipe joint in the gas path, which can not be removed at will, but also cleaned regularly.
(8) the shell of the drilling rig is made of aluminum alloy. It is strictly prohibited to fall, smash and press.
(9) disassemble and clean regularly, clean all parts in the motor housing and add lubricating oil. Parts with severe wear shall be replaced. Generally, the two handles do not need to be removed, but the air pipe connector can be removed to clean the filter screen.

