
Add to Cart
Core Drilling Rig Soil Detection Geological Exploration Drilling Rig Factory
Geological Drilling Rig brief introduction
Xy-2b drilling rig is a hydraulic vertical shaft drilling rig, which can be equipped with diesel engine or electric motor as power. This drill is mainly used for diamond drilling and cemented carbide drilling in solid deposits. At the same time, it can be used for engineering geological exploration drilling and foundation pile hole drilling.
The drilling depth is 300 meters.
Geological Drilling Rig parameters
Drilling capacity (m) | Φ73 rod | 100 |
Φ60 rod | 320 | |
Φ50 rod | 380 | |
Φ42 rod | 530 | |
Spindle speed(r/min) | Forward | 57;99;157;217;270;470;742;1024 |
Reverse | 45;212 | |
Max torque(Nm) | 2760 | |
Drilling angle renge | 0-90° | |
Spindle max pull force(KN) | 60 | |
Spindle stroke (mm) | 600 | |
Hoist max lift capacity with single rope (KN) | 30 | |
Spindle inner dia (mm) | 76 | |
Oil pump | SCB32/12 | |
Power unit | Electric motor | Y180L-4,22Kw |
Diesel engine | 395K2,19.85Kw | |
Overal dimension (mm) | 2150×900×1690 | |
Drill weight(excluding power)(kg) | 950 |
Product technical features:
1. Tight mechanical transmission structure, light weight.
2. The vertical shaft diameter of the rotator is large, the bearing distance is large, and the rigidity of the drilling rig is good.
3. Through hole diameter vertical shaft is equipped with hexagonal active drill pipe to ensure torque transmission.
4. The drilling rig has high speed and reasonable speed range, which can meet the requirements of small diameter diamond drilling and large diameter hard drilling
And drilling each engineering hole.
5. In the process of controlling feeding, the hydraulic system can adjust both the feeding pressure and the feeding speed to adapt to different conditions
It is necessary for drilling.
6. It is equipped with bottom hole pressure indicator to control the pressure in the hole.
7. The transmission and clutch of the selected automobile are universal and easy to maintain.
8. Less and concentrated handle, easy to operate
Packing & Delivery
Packaging: 1. Wooden case and iron construction packing;
2. As per your requirements.
Shipping: 1. professional goods shipping forwader;
2. port: Shanghai, Qingdao, Dalian, Ningbo.
Delivery: within 5-7 days after receiving the payment.