Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Borehole Drilling Machine /

GK 200 Borehole Drilling Machine For Water Well And Exploration Drilling

Contact Now
Jinzhou City Shitan Machinery Equipment CO. LTD.
Visit Website
City:jinzhou
Province/State:hebei
Country/Region:china
Contact Person:MissAnna
Contact Now

GK 200 Borehole Drilling Machine For Water Well And Exploration Drilling

Ask Latest Price
Video Channel
Brand Name :JINZHOU SHITAN
Model Number :GK 200
Certification :ISO9001
Place of Origin :China
MOQ :1 set
Price :Negotiation
Payment Terms :T/T, Western Union
Supply Ability :2000 sets per year
Delivery Time :7-10 days
Packaging Details :Standard Export Package
Product Name :GK 200 Borehole Drilling Machine
Hole depth :200m
Drilling Hole Diameter :295mm
Power Type :Diesel Engine
Usage :Water Well
Voltage :220V/380V
Application :Soil Sampling,Water well drilling
Place of origin :China,Hebei
OEM :Acceptable
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

GK 200 Borehole Drilling Machine For Water Well And Exploration Drilling

GK200 Borehole Drill Rig Introduction

GK 200 drilling rig is a hydraulic feed portable drilling rig, 200 meters drilling depth ,295mm hole diameter , It is a kind of hydraulic feeding, high speed, high speed torque belt and portability with pump.which is suitable for engineering geological exploration of industrial and civil buildings, railways, hydropower, transportation, bridges, dam foundations and other buildings.

GK200 Borehole Drill Rig Tech Data

Drilling depth 200m
Open hole diameter 75-300mm
End hole diameter 75mm
Active drill rod 53/59*4200mm
Rod diameter 50,60mm
Drill angle 90°-75°
Matched power(diesel power) 22hp diesel
Dimension 2800*950*1700mm

GK200 Borehole Drill Rig Advantages

1. It has a hydraulic automatic feeding mechanism to improve drilling efficiency and reduce labor intensity.
2. It adopts the ball card clamping mechanism instead of the chuck, and can implement the non-stop bar, easy to operate, safe and reliable.
3.The hoist is equipped with a frame to form a double-sided support star structure that can withstand strong impact.
4.Four sets of bearing positioning of the vertical axle box ensure that the gyrator has sufficient rigidity to deal with complex geological conditions such as gravel layer and pebble layer.
5.This machine adopts a taper clutch, which has the characteristics of large transmission torque, convenient operation and maintenance-free.

GK200 Borehole Drill Rig Application & Scope

XY-1A drilling rig is mainly used for geological general investigation and exploration, road and tall buliding foundation exploration, kinds of hole in concrete structure, river levees,earth temperature central air-conditioner,etc.XY-1 Series are spindle core geotechnical drilling rigs most perfectly suitable for borehole drilling in geo-construction and geo-technical exploration drilling in projects like civil building, construction of railway, hydropower, highway, bridge and dam etc

What is the reason for the high oil temperature in the drill

The high temperature in the drilling rig is generally divided into the high temperature of the gearbox, the high temperature of the hydraulic oil, and some are the high temperature of the engine cooling liquid. In fact, the reason for the high temperature of the gearbox is very simple. The main reason is that the size and shape of the bearing or gear and housing are not standard or the oil is unqualified. Now let's give you a detailed analysis.

Hydraulic oil temperature is too high:

First of all, the temperature of hydraulic oil is too high. According to hydraulic theory and maintenance experience in recent years, the main reason for the high temperature of hydraulic oil is too fast heat generation and too slow heat dissipation. The oil inlet pipeline and hydraulic oil tank of the hydraulic pump are not sealed tightly, the oil inlet filter element is blocked, the hydraulic system pipeline is not unblocked, and the internal leakage of the hydraulic pump will cause a large amount of heat to be generated in the hydraulic oil, so that the temperature of the hydraulic oil will rise rapidly due to excessive heat generation.

The internal channel of the hydraulic oil radiator is blocked, the external dust of the radiator is too large, the wind force is not enough, and the hydraulic oil does not pass through the hydraulic oil radiator, which can lead to the high temperature of the hydraulic oil due to the slow heat dissipation

GK 200 Borehole Drilling Machine For Water Well And Exploration Drilling

GK 200 Borehole Drilling Machine For Water Well And Exploration Drilling

GK 200 Borehole Drilling Machine For Water Well And Exploration DrillingGK 200 Borehole Drilling Machine For Water Well And Exploration DrillingGK 200 Borehole Drilling Machine For Water Well And Exploration DrillingGK 200 Borehole Drilling Machine For Water Well And Exploration DrillingGK 200 Borehole Drilling Machine For Water Well And Exploration Drilling

Inquiry Cart 0