Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Water Well Drilling Rig Machine /

200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration

Contact Now
Jinzhou City Shitan Machinery Equipment CO. LTD.
Visit Website
City:jinzhou
Province/State:hebei
Country/Region:china
Contact Person:MissAnna
Contact Now

200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration

Ask Latest Price
Video Channel
Brand Name :ShiTan
Model Number :GK 200
Certification :ISO
Place of Origin :China
MOQ :1 set
Price :USD2700-USD4800
Payment Terms :T/T, L/C, Western Union
Supply Ability :5000sets/year
Delivery Time :10 days after payment
Packaging Details :Plastic film and Standard export wooden box
Product Name :GK 200 Water Well Drilling Rig
Drilling Depth :200 meters
Voltage :220/380V
Guarantee :1 year
Service :OEM
Key Word :Rock Drilling ,Water Well Drilling Rig
Drilling Hole Diameter :295mm
OEM :Acceptable
Color :Yellow,blue,red
After sale service :Video Support
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration

GK 200 Drilling Rig Product Description

GK 200 mobile drilling machine is widely used and hydraulic feeding , which has the characteristics of large power, large lifting force (2T) and high transmission torque. Engineering geological investigation of railways, hydropower, traffic, bridges, dam foundations and other buildings.
Geological core drilling, physical prospecting. Small grout Confucius, drill hole drilling. Small well drilling.

GK 200 Drilling Rig Product Technical Information

Drilling Rig
Drilling diameter(mm) 75,91,110,130,150,300
Drilling depth (m) 200,150,100,70,50,30
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Mobile device
Moving length 350mm
Leave distance 300mm
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50
Oil pump
Oil pump type YBC -20/125
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500
Diesel engine or motor
Diesel engine 1115
Rated power (KW) 16.2
Rated speed (r/min) 2200
Rated pressure(Mpa) 12.5
Motor type Y160M - 4
Rated power (KW) 11
Rated speed (r/min) 1460


GK200 Drilling Rig Main Features

1. Very powerful at soil, sand, hard rock, etc. land condition.

2. Three kinds drill bits (three-wing bit, alloy bit and diamond bit) available for your choice, which can drill both soft and hard ground, especially

diamond drill bit effective in drilling hard rocks.

3. Hydraulic control system for greatly improving the working efficiency, saving labor force.

4. Mounted wheel or trailer, can be hauled easily by car or tractor, convenient to transport.

5. Power can be diesel engine or electric motor, as per your request.

Precautions for courtyard drilling

1. Consider whether the well depth is reasonable

We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.

2. Convenience, health and other issues should be considered.

After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.

3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.

200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration

Inquiry Cart 0